Energy, Mining and Business Consulting

Energy and mining ventures, built on Indonesian ground and Asian capital.

DEHAKA Group develops, funds, and operates assets across energy, mining, infrastructure, and sustainable solutions. We carry a project from licence and structure through to the crew that runs the site.

Head office Gedung EightyEight@Kasablanka, Lt. 25 Unit G, Jl. Casablanca Raya Kav 88, Jakarta Selatan 12870
Scroll

Four registered entities

Every agreement is signed by a named Indonesian PT, not a trading name.

Board across two markets

Directors and commissioners based in Indonesia and in China.

Two physical locations

A Jakarta head office and an operating base in Bantar Gebang, Bekasi.

Reporting on a fixed cycle

Reporting runs on a fixed cycle, in the format and language a partner board uses.

Vision

To become a leading infrastructure group for energy and mining across Southeast Asia.

Mission

To deliver integrated and reliable infrastructure solutions that drive growth in the energy and mining sectors.

Core values

PACT, the four things a partner can hold us to.

P

Professionalism

We bring expertise, standards, and discipline to every engagement we take.

A

Accountability

We take ownership of what we promise and report on it in the open.

C

Courage

We say plainly what is missing in a project, even when it costs us the deal.

T

Trust

We build relationships on honesty and mutual respect, over years not quarters.

Our businesses

Four sectors, one group, one point of contact.

Energy, mining, infrastructure, and sustainable solutions sit inside DEHAKA Group rather than across separate vendors. A partner talks to one team about licence, funding, and operations.

Insulated steel pipework and valve handwheels at an onshore gas processing skid, surrounded by tropical vegetation

Energy

Oil and gas blocks taken from licence review through to funding structure and production.

Block and concession review · Funding and ownership structure · Crude and gas offtake

Working benches of an open pit coal mine seen from the pit floor, with laterite haul roads and tropical forest on the rim

Mining

Gold mining operations, resource development, and the movement of production to refiners.

Site operations and logistics · Reserve development · Gold offtake agreements

Steel structural framework, rebar cages and a crawler crane on an industrial construction site in tropical Indonesia

Infrastructure

The civil and structural work a project stands on, from site access to plant.

Site access and haul roads · Civil and structural works · Plant construction

Ground mounted solar array on cleared laterite ground with tropical forest along the far edge

Sustainable Solutions

Solar capacity and land rehabilitation built alongside the conventional assets.

Solar generation · Grid connection · Mine site rehabilitation

Leadership

The people who sign, and the people you will actually meet.

Bagas Deka Kurtianto, President Director of DEHAKA Group

Bagas Deka Kurtianto

President Director

董事长 · 贝德卡

Macarthur S. Watson, President Commissioner of DEHAKA Group

Macarthur S. Watson

President Commissioner

监事委员会主席 · 乔照棋

Jason Du, Vice President Director of DEHAKA Group

Jason Du

Vice President Director

副董事长 · 杜斌

Qu Jiang Lin, Director and General Manager of DEHAKA Group

Qu Jiang Lin

Director and General Manager

董事兼总经理 · 屈江林

We do not chase deals. We build the entity, the permits, and the crew that keep an asset producing long after the signing is done.

One group, three companies

DHK Energi, Hasta Kapital
DEHAKA Mining
DEHAKA Consulting
Engineers in hard hats on an industrial site at dusk, illustrating the sectors DEHAKA Group operates in

Image shown for sector context

One team on the ground, one board behind it.

The people who structure a deal in Jakarta and the people who run the site report into the same group. That is why a partner gets one answer rather than three.

How an engagement runs

Three steps from first call to a site that reports.

01

Scope the asset

We review the concession, the permit position, and the offtake picture, then say plainly what is missing before anything is signed.

02

Structure the vehicle

We set the entity, the ownership split, and the funding path across the Indonesian and the offshore side, with counsel involved from the start.

03

Operate and report

Our team runs the site and reports on a fixed cycle, in the language and the format a partner board already uses.

Strategic
partnerships

Pertamina Bukit Asam Vale

Get in touch

Bring us the asset.
We will tell you
what is missing.

No pitch deck required for the first call. A concession number, a permit status, and what you are trying to fund is enough to start.

Your message is ready in your email client. Send it and we will reply within two working days.

Please enter your name.

Please enter a valid email address.

Please tell us a little about the asset.

Both buttons send the same details. We reply within two working days, and nothing you send is shared outside the group.

WhatsApp